Update 05.12.17 – The drinking water fountains are all once again working normally.  Thank you for your patience. The water fountain in the teaching room corridor near the Postgraduate Suite is currently out of order.  Estates are working to fix the …

Resolved: Teaching room corridor water fountain temporarily unavailable Read more »

Preparatory electrical works and construction of a stud wall for the installation of the 60 additional laptop loan lockers in Area 0B will begin on Wednesday 29th November.  This will start with the electrical works.  A small area of Area 0B …

Resolved: Minor construction work in Area 0B (29-30 November) Read more »

Update 27.11.17 – We are pleased to report that all the toilets are once again open and working normally.  Thank you for your patience. The ladies toilet block inside the Library entrance has been closed due to flooding.  Alternative toilet …

Front entrance ladies toilets temporarily unavailable (resolved) Read more »

Update 20.10.17 – All the Library toilets are open and working normally again. Thank you for your patience. We regret the men’s toilets at the rear of the building (situated in the Ravelin Park side teaching room corridor near the …

Ravelin Park side toilets closed for maintenance (resolved) Read more »

Update 11.08.17 – The drinking water fountain outside the Postgraduate Study Suite has now been replaced with a new stainless steel drinking fountain.  Thank you for your patience and we hope you enjoy this new and improved facility. We regret the drinking fountain outside …

Teaching corridor drinking fountain out of order (resolved) Read more »