Resolved: Minor construction work in Area 0B (29-30 November)

Preparatory electrical works and construction of a stud wall for the installation of the 60 additional laptop loan lockers in Area 0B will begin on Wednesday 29th November.  This will start with the electrical works.  A small area of Area 0B will be closed off and without power to allow this work to be carried out between 29-30 November.
Posted in Uncategorised Tagged with: , ,