Roofing project update: work moves to Area 2C

Areas 0A and 1A have now been re-opened, cleaned and cleared for you to use again.  The roofing work has now moved to Area 2C.  A platform has been installed around the windows in Area 2C while the roof windows in this area are replaced.  This area is expected to become cold and noisy at times over the next week as the roof windows are replaced.

Free ear plugs are available from the Welcome Desk in the Atrium and alternative Individual Silent Study space is available across the top floor.  For postgraduate students, Individual Silent Study is available in the Postgraduate Suite (rooms 0.39-0.41).

Posted in Uncategorised Tagged with: , ,